Improve Air conditioning PPM Schedule and phased air conditioning replacement

Hospitality
Webb Group Hotels – The Gables Hotel
South Gloucestershire

Smart Projects has cultivated a strong working relationship with the Webb Group, collaborating with their lead Project Manager, Matt, on numerous successful projects.

The challenge

The project involved The Gables Hotel, a charming property nestled in the picturesque town of Wotton-Under-Edge. The hotel's main function room was hampered by an outdated, malfunctioning, and leaking air conditioning system. Following an engineer's assessment, Smart Projects presented two options: repair the existing system or undertake a full replacement.

The solution

Recognising the need for a guaranteed long-term solution and prioritising efficiency, the decision was made to replace the existing air conditioning system. This approach ensured optimal performance, reliability, and energy savings for The Gables Hotel.

Smart projects were able to reuse some of the existing pipework within the ceiling void. Keeping costs and time on site to a minimum.

The result

Guests now enjoy consistent, comfortable temperatures throughout the hotel, regardless of the season.

The new system operates quietly and efficiently, enhancing the overall ambiance of the property. The project was delivered on time and within budget, demonstrating Smart Projects' commitment to quality and customer satisfaction.

We are looking forward to completing the future planned phases.

The project was completed on time and within the initial budget. Ongoing maintenance is to be provided

The work was carried out and completed on schedule, working closely with the on-site maintenance team. Now the next phase is due to begin, which shows the group's continued focus on investing in efficient and sustainable heating.

Matthew Kinnes
Project Manager
Enhanced Guest Comfort

Enhanced Guest Comfort: The new system provides superior temperature control, creating a more comfortable and enjoyable environment for all guests.

Improved Energy Efficiency

The modern, energy-efficient units substantially reduce energy consumption, lowering operating costs and minimising the hotel's environmental impact.

Reduced Noise Levels

The new units operate significantly more quietly than the previous system, contributing to a more peaceful and relaxing atmosphere.

Future-Proofing the Hotel

Investing in a modern, efficient system ensures that The George Hotel is well-equipped to meet the comfort needs of guests for years to come.